Bobick, T G (2004) Falls through Roof and Floor Openings and Surfaces, Including Skylights: 1992–2000. Journal of Construction Engineering and Management, 130(06), 895–907.

Chan, S and Leung, N (2004) Prototype Web-Based Construction Project Management System. Journal of Construction Engineering and Management, 130(06), 935–43.

Cheah, C Y J, Garvin, M J and Miller, J B (2004) Empirical Study of Strategic Performance of Global Construction Firms. Journal of Construction Engineering and Management, 130(06), 808–17.

Cheng, E W L and Li, H (2004) Development of a Practical Model of Partnering for Construction Projects. Journal of Construction Engineering and Management, 130(06), 790–8.

Cheung, S O, Yiu, K T W and Suen, H (2004) Construction Negotiation Online. Journal of Construction Engineering and Management, 130(06), 844–52.

Chung, T H, Abraham, D M and Gokhale, S B (2004) Decision Support System for Microtunneling Applications. Journal of Construction Engineering and Management, 130(06), 835–43.

Fang, D, Fong, P S and Li, M (2004) Risk Assessment Model of Tendering for Chinese Building Projects. Journal of Construction Engineering and Management, 130(06), 862–8.

Fang, D, Li, M, Fong, P S and Shen, L (2004) Risks in Chinese Construction Market—Contractors’ Perspective. Journal of Construction Engineering and Management, 130(06), 853–61.

Hanna, A S, Camlic, R, Peterson, P A and Lee, M (2004) Cumulative Effect of Project Changes for Electrical and Mechanical Construction. Journal of Construction Engineering and Management, 130(06), 762–71.

Koksal, A and Arditi, D (2004) Predicting Construction Company Decline. Journal of Construction Engineering and Management, 130(06), 799–807.

Lee, H, Yu, J and Kim, S (2004) Impact of Labor Factors on Workflow. Journal of Construction Engineering and Management, 130(06), 918–23.

Marzouk, M and Moselhi, O (2004) Fuzzy Clustering Model for Estimating Haulers’ Travel Time. Journal of Construction Engineering and Management, 130(06), 878–86.

  • Type: Journal Article
  • Keywords: Travel time; Fuzzy sets; Models; Construction equipment; Earthmoving; Construction management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(878)
  • Abstract:
    This paper presents a two-step fuzzy clustering method for estimating haulers’ travel time. The proposed method provides a generic tool that can be incorporated in models dedicated for estimating earthmoving production. The estimated travel time takes into account the acceleration and deceleration in the transition zones. The developed method utilizes linear regression and fuzzy subtractive clustering. Seven factors influencing haulers’ travel time were first identified and their significance was then quantified using linear regression. The regression analysis was performed utilizing 180 training cases, generated using commercially available software for different models of haulers. The data were generated randomly to represent a wide range of possible combinations of factors affecting travel time of haulers across different types of road segments. The training data were subsequently used in the development of the proposed method. Unoptimized subtractive clustering, optimized Takagi–Sugeno zeroth-order subtractive clustering, and optimized Takagi–Sugeno first-order subtractive clustering were used in estimating haulers’ travel time. Their performance was evaluated using 36 test cases, also generated randomly in a similar manner to those utilized for training. The optimized Takagi–Sugeno first-order subtractive clustering model was found to outperform the other two, and was accordingly used in the proposed method. A numerical example is presented to demonstrate the use of the developed method and illustrate its accuracy.

Rowe, G M, Meegoda, J N, Jumikis, A, Sharrock, M J, Bandara, N and Hettiarachchi, C H (2004) NJTxtr—A Computer Program Based on LASER to Monitor Asphalt Segregation. Journal of Construction Engineering and Management, 130(06), 924–34.

Senouci, A B and Eldin, N N (2004) Use of Genetic Algorithms in Resource Scheduling of Construction Projects. Journal of Construction Engineering and Management, 130(06), 869–77.

Son, J and Mattila, K G (2004) Binary Resource Leveling Model: Activity Splitting Allowed. Journal of Construction Engineering and Management, 130(06), 887–94.

Tam, C M, Tong, T K L and Wong, Y W (2004) Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. Journal of Construction Engineering and Management, 130(06), 827–34.

Thomas, H R, Horman, M J and de Souza, U E L (2004) Symbiotic Crew Relationships and Labor Flow. Journal of Construction Engineering and Management, 130(06), 908–17.

Tsao, C C Y, Tommelein, I D, Swanlund, E S and Howell, G A (2004) Work Structuring to Achieve Integrated Product–Process Design. Journal of Construction Engineering and Management, 130(06), 780–9.

Walsh, K D, Hershauer, J C, Tommelein, I D and Walsh, T A (2004) Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain. Journal of Construction Engineering and Management, 130(06), 818–26.

Whalen, T M, Gopal, S and Abraham, D M (2004) Cost-Benefit Model for the Construction of Tornado Shelters. Journal of Construction Engineering and Management, 130(06), 772–9.